How do I know if I will need a USACE Regulatory permit? If work is to be conducted on or near a federally authorized project, which may include a dam, levee, flood wall, federal navigation channel, or reservoir including work in uplands, please contact Your project may require a 408 permission by USACE (see ). Additional contacts are also listed to help answer your questions. The complete list of phone numbers and emails for USACE Regulatory staff can be found at: The Portland District Regulatory Branch has jurisdiction over the state of Oregon, southern Washington ports and restoration projects in the Columbia River estuary funded by the Bonneville Power Administration. Army Corps of Engineers Regulatory Program is committed to protecting the Nation's aquatic resources and navigation capacity, while allowing reasonable development through fair and balanced decisions. Many water bodies and wetlands in the nation are waters of the United States and are subject to the Corps' regulatory authority. Under Section 404, a permit is required for the discharge of dredged or fill material into waters of the United States. Under Section 10, a permit is required for work or structures in, over or under navigable waters of the United States. Army Corps of Engineers, through the Regulatory Program, administers and enforces Section 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act. As a result of changing public needs and evolving policy via new laws and court decisions, protection has been extended to all waters of the United States including many wetlands. Army Corps of Engineers Regulatory Program began in 1890 with the responsibility of protecting and maintaining the nation’s navigable waterways.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |